Capital Improvement Projects

Capital Improvement Projects

Overview

SCV Water’s Capital Improvement Program (CIP) concentrates on the development of a long-range framework in which physical projects are planned and implemented within the Agency’s financial capabilities. Capital Improvements include the purchase, construction, replacement, addition, or major repair of public facilities, infrastructure, and equipment.

Below is a list of our current Capital Improvement Projects:

 

Planning

  • Bouquet Tank Pipeline Replacement
  • Discovery Park Wells Project
  • Tank #3 Pipeline Replacement
  • Newhall Ranch Road (West of Avenue Tibbits) Pipeline Replacement
  • Needham Ranch Concrete Tank 3MG
  • PFAS Groundwater Treatment Improvements: Lost Canyon, Sand Canyon, and Mitchell 5B Wells; E Wells; Wells W10, W9, 206, and 207
  • Pin Court Well Project
  • Pinetree Groundwater Recharge Project

 

  • Peachland Tanks Slope Stabilization and Access Road Improvement
  • Route Tank Slope Stabilization and Access Road Improvement
  • RVWTP Mechanical Shop and Access Road Paving
  • The Old Road Pipeline Improvement (McBean Parkway to Pico Canyon Road)
  • Sierra Highway (Newhall Ave and Dockweiler Ave) Pipeline Improvement
  • Villa Tank Slope Stabilization and Access Road Improvement.

Design

  • 20" RW Pipeline Relocation in The Old Road
  • Backcountry Reservoir
  • Backcountry Pump Station
  • Bouquet Canyon Trail
  • Castaic Conduit Bypass Pipeline
  • Commerce Center Bridge Pipeline
  • Deane Pump Station at Skyline Ranch Road
  • Honby Parallel Pipeline
  • Honby Tanks Pipeline Improvements
  • Magic Mountain Parkway and The Old Road Recycled Water Relocation

 

  • N Wells Drainage Improvements Project
  • Newhall Wells (N11, N12, N13) Groundwater Treatment Improvements
  • RVWTP Sewer Line
  • Sand Canyon Sewer Line
  • Saugus #3 and #4 Well Equipment and Site Improvements
  • Sierra Highway Bridge Pipelines Protection and Installation
  • S Wells Water Treatment Facility

Construction

  • Abdale, Maplebay Beachgrove and Smyth Pipelines
  • Deane Pump Station at Sand Canyon Plaza
  • Backcountry Pump Station Pipeline
  • Foothill Feeder Turnout Repair Project
  • LA-2 Turnout
  • Magic Mountain Pipeline Inspection Access Modifications
  • Nimbus Tank No. 2
  • Saugus 1 & 2 Wells VOC Treatment and Disinfection Facility

 


Recently Completed

  • Bridgeport Pocket Park
  • Commerce Center Drive Pipeline
  • Dickason Drive Pipeline
  • ESFP Wash Water Return and Sludge Collection Improvements
  • Magic Mountain Pipeline Phase 4, 5, 6A and 6B
  • Pitchess Pipeline Modifications
  • RVWTP Diesel Underground Storage Tank Replacement
  • Santa Clara & Honby Wells PFAS Groundwater Treatment Improvements
  • Vista Canyon Recycled Water Main Extension (Phase 2B)